Recent Bridges

Next
End
   
Design & Construct Doonella Footbridge at Hilton Terrace, Tewantin
Bridge Type: Design and construction of a 77.5m Footbridge using PSC kerb units and spanning slabs.  Work also includes tie-ins to existing footpath.
Length: 2 spans at 23m; 1 span at 13.3m; 2 spans at 9.1m
Pile Type: Prestressed concrete.
Number/Size of Pile: 10 No 550mm Octagonal
Client: Sunshine Coast Regional Council
Approx. Value: $1.5m
 
Endeavour River Bridge and Approach Roadworks on Endeavour Valley Road, Cooktown
Bridge Type: Construction of a 125m long PSC Deck Unit Bridge to replace the existing timber bridge including 700m of Approach Roadworks.
Length: 5 Spans at 25m long
Pile Type: Cast-in-place
Number/Size of Pile: 18 No 1500mm diameter up to 26m length
Client: Department of Main Roads Cairns
Approx. Value: $7.2m
 
Pocket Road Bridge and Approach Roadworks, Hinze Dam Stage 3
 
Bridge Type: Construction of a 56m long PSC Deck Unit Bridge to replace the existing timber bridge including Approach Roadworks and widening of tie in to existing pavement.
Length: 3 Spans at 19m long
Pile Type: Cast-in-place
Number/Size of Pile: 8 No 600mm and 4 No 900mm diameter
Clients: Hinze Dam Alliance - Theiss
Approx. Value: $1.8m
 
Boyne River Bridge and Approach Roadworks on Proston-Boondooma Road
 
Bridge Type: Construction of a 72m long PSC Deck Unit Bridge including 200m of Approach Roadworks and maintenance of existing sidetrack.
Length: 4 Spans at 18M long
Pile Type: PSC and Cast-in-place
Number of/ Size of Pile: 13 No 550mm Octagonal PSC and 6 No 200mm diameter cast in place
Client: Department of Main Roads Toowoomba
Approx. Value: $1.4m
 
Helen Street Footbridge -
South Golden Beach NSW
 
Bridge Type: Construction of a 60m long reinforced concrete/structural steel/timber Footbridge including sheet piling for footing construction.
Length: 1 span at 24m; 2 spans at 18m long
Pile Type: Cast-in-place pad footings at piers and mass concrete at abutments
Number of/ Size of Pile: N/A
Client: Byron Shire Council
Approx. Value: $555k
 
Noble Street Footbridge - Herston
 
Bridge Type: Construction of a 51m long PSC Deck Unit Footbridge including cast insitu deck using FC sheet and design and construction of temporary work platforms and bunds.
Length: 3 Spans at 17m long
Pile Type: Cast-In-Place
Number of/ Size of Pile: 8 No 750mm diameter up to 20m long
Client:Brisbane City Council
Approx. Value: $1.2m
 
Design and Construction of Dulgigin Creek Bridge - Alice NSW
 
Bridge Type: Design and construction of a 50m long Humedeck Unit Bridge to replace the existing timber bridge including supply and installation of precast piles, headstocks and relieving slabs.
Length: 5 spans at 10m long
Pile Type: Driven RC square piles
Number of/ Size of Pile: 24 No 450mm square
Client:Clarence Valley Council
Approx. Value: $1.5m
 
Design and Construction of Victoria Street Bridge at Townsville
 
Bridge Type: Design and construction of a 20m long PSC Deck Unit Bridge to replace the existing bridge including approach roadworks, staged construction, slope stabilisation and retaining walls.
Length: 1 span at 20m long
Pile Type: Mass concrete and passive anchors at abutments
Number of/ Size of Pile: N/A
Client: Townsville City Council
Approx. Value: $2.3m
 
Next