Nindooinbah Bridge
 
Construction of a new three span, two lane concrete bridge to replace the existing single lane timber bridge, demolition of the existing timber bridge, improvement of approaches and associated works.
Client: Beaudesert Shire Council
Approx. Value: $1.5m
 
Pedestrian / Cycleway Over Road Bridge
 
Single span Pedestrian / Cycleway bridge over Guineas Creek Road, Elanora including bored piling.
Clients: Gold Coast City Council
Approx. Value: $400k
 
Riverlinks Stage 9 Bridge
 
The design (where required) supply and construction of a 78m long, four span bridge including 35 x 550 dia octagonal pile , piers, headstocks, abutments, prestressed concrete deck units, precast concrete kerb units, bridge railings, pedestrian balustrades, precast feature pillars and timber viewing platforms.
Client: Leighton Contractors Pty Limited
Approx. Value: $1.5m
 
Riverlinks Stage 5 Bridge
 
The design (where required) supply and construction of a 78m long, four span bridge including piled foundations, piers, headstocks, abutments, prestressed concrete deck units, precast concrete kerb units, bridge railings, pedestrian balustrades, precast feature pillars and timber viewing platforms.
Client: Leighton Contractors Pty Limited
Approx. Value: $1.25m
 
Creek Road Bridge - Carindale
 
Demolition of existing bridge and construction of a new 2 lane concrete bridge including 6 x 750 mm dia bored piles at Creek Road, Carindale.
Client: Brisbane City Council
Approx. Value: $300k
 
Canarvon Highway, Widening Of Existing Bridge At Hurdle Creek & Hutton Creek
Image
Hurdle Creek Bridge on Canarvon Highway (Roma-Injune) 56.45 km north of Roma.  Widen existing 6.7m wide concrete bridge at Hurdle Creek to 8.6m width between kerbs.

Hutton Creek Bridge on Canarvon Highway (Injune-Rolleston) 15.34km north of Injune.  Widen existing 6.7m wide concrete bridge at Hutton Creek to 9.2m width between kerbs.
Client: QLD Department of Main Roads (South Western District)
Approx. Value: $1m
 
Construction of two bridges on Esk -
Hampton Road
Image
The construction of two reinforced concrete bridges being crossings 4 and 5 of Redbank Creek on the Esk - Hampton Road including associated roadworks at the approaches including earthworks, drainage, paving, bitumen surfacing and roadside furniture.
Client: QLD Department of Main Roads (Southern District)
Approx. Value: $3.5m
 
Replacement of Hayes Bridge and improvement of approaches, Widgee Creek Road
Image
Works include the construction of a new two lane concrete bridge to replace the existing single lane timber bridge, demolition of the existing timber bridge, improvement of approaches and associated works.  The bridge construction is planned in two stages, the first stage being construction of a part of the bridge and the second stage being the completion of the bridge with traffic allowed on the already constructed part.
Client: Beaudesert Shire Council
Approx. Value: $850k
 
Design and construction of
Bald Hills Creek Bridge, Crows Nest
 
Design and construction of a single span bridge over Bald Hills Creek to replace the existing structure.  Construction will include bored piles, abutments, relieving slabs and installation of PSC deck units.
Client: Crows Nest Shire Council
Approx. Value: $500k
 
Construction of Chinghee School Bridge, Chinghee Creek
 
Construction of a single span, two lane replacement bridge over Chinghee Creek including installation of bored pile foundations and PSC deck units, approach roadworks and associated traffic control.
Client: Beaudesert Shire Council
Approx. Value: $500k
 
Rickertt Road Bikeway Bridge Superstructure
 
The bridge construction consisted of 11 concrete headstocks of which 6 were over water and 5 were on land.  All headstocks were formed in-situ and poured.  Forms for the headstocks were supported off the sacrificial steel pile liner.  Construction works for this project also included, supply and installation of pedestals and bearings, installation of all deck units (supplied by others), construction of decking slabs including installation of all reinforcement and jointing.  Construction of drainage structures on existing bridge at scupper location, including all preparation works , installation of balustrade (supplied by others) and construction of reliving slabs.
Client: Brisbane City Works
Approx. Value: $600k
 
Esk-Kilcoy Road
2nd Waterfall Gully Bridge Rehabilitation
 
Rehabilitation and widening of 2nd Waterfall Gully Bridge including replacement of Abutment B with a Concrete abutment.
Client: QLD Department of Main Roads (Southern District)
Approx. Value: $200k