Westwoods Stage 5 -
Bullock Bray Drive Bridge, Mount Crosby
 
Construction of a single span bridge incorporating bored pile foundations, PSC deck units, retaining walls and rock protection at abutments.
Client: WM Projects
Approx. Value: $500k
 
Six Mile Creek Bridge -
Riverview to Redbank Connection Project
 
Consists of 2 x 21m span PSC Bridge over Six Mile Creek including reinforced soil abutments, bored piles and high level piers.  This project was under Quarantine Notice to prevent the spread of fire ants in Queensland.
Clients: Ipswich City Council
Approx. Value: $750k
 
Anzac Avenue Pedestrian Bridge, Mango Hill
 
Construction of pedestrian bridge with prestressed girders, concrete slab and bridge rail.
Client: Lensworth Northlakes
Approx. Value: $175K
 
'The Lakes' Twin Waters Bridge
 
This contract is for the construction of a 1 x 20m span, prestressed concrete bridge and associated works and the design, manufacture and delivery to site of 10 precast concrete pile units for the reinforced concrete bridge.
Client: Lend Lease Developments Pty Ltd
Approx. Value: $275k
 
Yallaroi Crossing Bridge
 
This contract comprises of the construction of a single 25m span  Yallaroi Crossing Bridge on the proposed Gaven Arterial Road on PSC piles and decks, insitu abutments and kerbs.
Client: Gold Coast City Council
Approx. Value: $250k
 
Birdwood Road, Holland Park
 
Construction of a 5 span bridge with post tensioned, cast in situ deck for the proposed Mt Pleasant Private Hospital.
Client: Philip Usher Constructions
Approx. Value: $350k
 
Pumicestone Road Bridge, Caboolture
 
Construction of 2-span, 2-lane, 30m long concrete bridge over King John Creek, including construction of Abutment earthworks, removal and stockpiling of existing pipe culverts in Pumicestone Road and constructions of a 200m long sidetrack.
Client: Caboolture Shire Council
Approx. Value: $550k
 
Birtinya Bridge
 
Construction of a five span PSC Bridge (4 spans 27.8m and 1 span 20.6m) with driven PSC octagonal piles at Kawana Waters on the Sunshine Coast. Works at the abutments include retaining walls, grouted rock batters and revetment walls.
Client: Neumann Contractors
Approx. Value: $1.75m
 
Reconstruction Of Walkerston-Homebush Road Ch 0-1600 & Bakers Creek Bridge
 
Construction of 3 span PSC Bridge and approx 2km of approach road works including stormwater drainage structures.
Client: Mackay City Council
Approx. Value: $1.1m
 
TE Peters Bridge Gold Coast Convention Centre
Image
Construction of an 8 spans PSC Bridge supported on driver PSC Piles including Walkway, Rail and Concrete Parapets together with various pile foundation structures to support Mono Rail and Pedestrian Walk Way.  Contract also includes construction of over 100lm cast-in-situ kerbed Retaining Wall and various smaller drainage structures.
Client: Neumann Contractors
Approx. Value: $2.25m
 
Construction Of Bridges And Approaches - Palm Creek And Lottery Creek
 
This contract is for the demolition of existing bridges and the construction of a 22m span PSC Bridge at Palm Creek and 5/3600 x 1800 culverts at Lottery Creek.
Client: Hinchinbrook Shire Council
Approx. Value: $550k