Gold Coast, QLD
Client
City of Gold Coast
Location
Gold Coast, QLD
Status
Completed
Start date
Finish date
Value
Expertise
Concrete pier, piling, deck units
Scope
Davbridge Constructions was engaged by City of Gold Coast to build the Southport Broadwater Pier. The project involved building a 200 m long concrete pier over the Broadwater. The works covered installation of the piles and 75 PSC deck units, using about 43 t of reinforcing steel, working over the water from barges. The project presented challenges such as building the full length of the pier from the water. Located on the Gold Coast Broadwater at Southport, this project demonstrated Davbridge Constructions' ability to deliver marine structures while maintaining environmental, community and safety standards.
200 m
Pier length
75
PSC deck units
43 t
Reinforcing steel
On site